US 17 at Tumbleston Road Intersection before.
|
|
US 17 at Tumbleston Road Intersection after.
|
|
US 17 at Longpoint Drive Intersection before.
|
|
US 17 at Longpoint Drive Intersection after.
|
|
Parkwest Boulevard at Thomas Cario Drive Intersection before.
|
|
Parkwest Boulevard at Thomas Cario Drive Intersection after.
|
|
6th Avenue Sidewalk
|
|
6th Street Sidewalk
|
FY '09 Resurfacing Projects
Click on the road names below to see the completed project.
FY '08 Resurfacing Projects
| Bay Tree Circle |
Ginger Lane |
| Bay Tree Court |
Salamander Road |
| Beresford Court |
Smoke Tree Court |
| Buck Hall Court |
Waterford Court |
| Fowler Court |
Bonds Avenue |
| Hopewell Court |
MacQueen Avenue |
| N. Bay Tree Court |
Marlow Drive |
| Ralson Court |
Sandyver Road |
| S. Bay Tree Court |
Trachelle Lane |
| Firetree Court |
Dills Bluff Road |
| North Shore Drive |
Swinton Court |
| Midland Park Road |
Eagle Landing Drive |
| Aragon Street |
|
Lillie and Rebecca Lane
Lillie and Rebecca Lane is an existing road in the Town of Mount Pleasant that extends north from Long Point Road near its intersection with Whipple Road. This project has improved Lillie and Rebecca Lane by widening and paving or resurfacing the entire length of the roadway. The total length of Lillie and Rebecca Lane is approximately 800 feet.
|
Lillie and Rebecca Lane Before
|
|
Lillie and Rebecca Lane After
|
East Berry Street
The project consists of paving two sections of East Berry Street, which is in the town of Lincolnville. The first section is from Railroad Avenue to Randolph Street. The second section is from Cain Street to Thomas Street.
|
East Berry Street Before
|
|
East Berry Street After
|
West Hudson Drainage Improvements
The project consists of drainage improvements in the City of Folly Beach near the intersection of West Hudson Ave. and West 3rd Street.
|
West Hudson Before
|
|
West Hudson After
|
Robinson Street
The project consists of relocating Robinson Street to a new location. Robinson Street was an earth road that was paved when relocated in the Town of Ravenel.
|
Robinson Street Before
|
|
Robinson Street After
|
Amberly Road Sidewalks
The Amberly Road Sidewalk project in the City of Charleston includes a new sidewalk the entire length of the road. The sidewalk is five feet wide and located on the south side of the road.
|
Amberly Road Before
|
|
Amberly Road After
|
Ben Sawyer Boulevard Sidewalks
Ben Sawyer Blvd. is an existing paved road, in the Town of Mount Pleasant. This project will improve Ben Sawyer Blvd. by providing a sidewalk along a portion of the roadway. This portion of roadway runs northwest to southeast between N. Point Lane and Center Street Ext. The total length of Ben Sawyer Blvd. sidewalk is approximately 590 feet.
|
Ben Sawyer Blvd. Before
|
|
Ben Sawyer Blvd. After
|
East Ashley Avenue
East Ashley Avenue is an existing paved road in the City of Folly Beach that runs parallel to the beach. This project improved the 1500 block of East Ashley Avenue by paving the existing shoulder in this portion of the roadway in order to create more parallel parking spots on the ocean side of the road. This project provides additional parking facilities for visitors to the beach and surrounding areas. The total length of East Ashley Avenue project is approximately 450 feet.
|
East Ashley Ave. Before
|
|
East Ashley Ave. After
|
Hattie Street
Hattie Street was an existing unpaved road in the Town of Mount Pleasant that extends north from Snowden Road. This project improved Hattie Street by widening and paving or resurfacing the entire length of the roadway and terminating the road into a new cul-de-sac. The total length of Hattie Street is approximately 800 feet.
|
Hattie Street Before
|
|
Hattie Street After
|
Lofton Court
This project consisted of drainage improvements along Lofton Court in the Town of McClellanville.
|
Lofton Court Before
|
|
Lofton Court After
|
Rivers Avenue Sidewalk
This portion of Rivers Avenue is an existing, paved, major artery in the City of North Charleston located north of Ashley Phosphate Road. The project improved Rivers Avenue by extending an existing sidewalk along its east side between Barnes & Noble bookstore to Eagle Landing Boulevard. The total length of sidewalk is approximately 420 feet.
|
Rivers Ave. Before
|
|
Rivers Ave. After
|
Rifle Range Road Sidewalk
Rifle Range Road is an existing paved road, in the Town of Mount Pleasant. This project will improve Rifle Range Road by providing sidewalk along a portion of the roadway. This portion runs south to north towards Harborgate Boulevard. The project will require an encroachment permit from SCDOT. The total length of Rifle Range Road sidewalk expected to be provided is approximately 1,060 feet. Construction complete.
Shem Creek Sidewalks
This project in Town of Mount Pleasant consists of a sidewalk along Lucas Street from Mill Street to Live Oak Drive and along Live Oak Drive from Lucas Street to Simmons Street. The sidewalk also continues along Simmons Street from Live Oak Drive to Mill Street.
|
Shem Creek
Lucas Before
|
|
Shem Creek
Lucas After
|
|
Rifle Range Before
|
|
Rifle Range After
|
Palmetto Commerce Parkway Phase I is now complete. This is the first bonded project to reach completion. Click here to go to the project page.
Completed Projects of the Fiscal Year 2007 (July 1, 2006 - June 30, 2007) Resurfacing Program
|
Calhoun Street Resurfaced
|
|
Longpoint Road Resurfaced
|
|
Mathis Ferry Road Resurfaced
|
|
Meeting Street Resurfaced
|
|
Dorchester Road in North Charleston
Resurfacing complete April 2007
|
|
Dorchester Road in North Charleston
Resurfacing complete April 2007
|
Completed Projects of the Fiscal Year 2007 (July 1, 2006 - June 30, 2007) Resurfacing Program
(Handicap Ramps)
Click on the photos below to view the enlarged before and after pictures of completed projects.
|
Morrison @ Brigade Before
|
|
Morrison @ Brigade After
|
|
Morrison @ Isabella Before
|
|
Morrison @ Isabella After
|
|
Morrison @ Williman Before
|
|
Morrison @ Williman After
|
|
Morrison @ Hannover Before
|
|
Morrison @ Hannover After
|
|
Morrison @ Conroy Before
|
|
Morrison @ Conroy After
|
Completed Projects of the Fiscal Year 2006 (July 1, 2005 - June 30, 2006) Resurfacing Program
Click here to view all completed roads in the 2006 Resurfacing Program.
Completed Projects of the Fiscal Year 2006 (July 1, 2005 - June 30, 2006) "Quick Start" Program
Click here to view all completed roads in the 2006 Quick Start
|
Creekwood Rd. Before
|
|
Creekwood Rd. After
|
|
Hamilton Rd. Before
|
|
Hamilton Rd. After
|
|
Old Jacksonboro Before
|
|
Old Jacksonboro After
|
|
Wine Road Before
|
|
Wine Road After
|
|
Jack Road
Before paving
|
|
Jack Road
After paving
|