SC 7 (Sam Rittenberg Boulevard) / SC 61 (Ashley River Road) Intersection Improvements

Project Status: future projectFuture Project

The project is currently in the design phase.

Project Description

Public Meeting Oct. 18 for SC-7 (Sam Rittenberg Blvd.)/SC-61 (Ashley River Rd.) Intersection Improvements Project

The goal of the SC-7 (Sam Rittenberg Boulevard) / SC-61 (Ashley River Road) Intersection Improvements Project is to improve safety and provide relief from traffic congestion that is currently experienced at the intersection. The improvements will extend along SC-61 from Wallace School Road to Wappoo Road and along SC-7 from Gardner Road to Wappoo Road. The improvements to the intersection consist of:

  • Construction of an additional left turn lane on the northbound SC-61 approach (coming from Wappoo Road toward Sam Rittenberg Boulevard).
  • Construction of an additional left turn lane on the southbound SC-61 approach (coming from Wallace School Road toward Sam Rittenberg Boulevard).
  • Extension of the southbound right turn lane on SC-7 (coming from Wappoo Road toward SC-61).
  • Lane width modifications to provide 11-foot thru lanes and 14-foot outside, shared-use lanes on SC-61 within the project limits.
  • Driveway modifications.
  • Traffic signal timing improvements to the intersections within the project limits.
Project Documents

Not available at this time

Past Public Meetings

Not available at this time