SC 7 (Sam Rittenberg Boulevard) / SC 61 (Ashley River Road) Intersection Improvements
Project Schedule
Not available at this time
Drawings & Maps
- Click here to see an aerial overlay of the proposed improvements
- SC 7 Typical Display
- SC 61 Typical Display
Photo Gallery
There are no images in this gallery.
Project Status:
Future Project
The project is currently in the design phase.
Project Description
The goal of the SC-7 (Sam Rittenberg Boulevard) / SC-61 (Ashley River Road) Intersection Improvements Project is to improve safety and provide relief from traffic congestion that is currently experienced at the intersection. The improvements will extend along SC-61 from Wallace School Road to Wappoo Road and along SC-7 from Gardner Road to Wappoo Road. The improvements to the intersection consist of:
- Construction of an additional left turn lane on the northbound SC-61 approach (coming from Wappoo Road toward Sam Rittenberg Boulevard).
- Construction of an additional left turn lane on the southbound SC-61 approach (coming from Wallace School Road toward Sam Rittenberg Boulevard).
- Extension of the southbound right turn lane on SC-7 (coming from Wappoo Road toward SC-61).
- Lane width modifications to provide 11-foot thru lanes and 14-foot outside, shared-use lanes on SC-61 within the project limits.
- Driveway modifications.
- Traffic signal timing improvements to the intersections within the project limits.
Project Documents
Not available at this time
Past Public Meetings
Not available at this time